Roll coating production line Performance features
The most cost-effective coating line, the formula process does not pick people, can be greasy, can be used as the bottom and finish, and UV process is necessary.
Technical parameters.
Production line speed: 16m / min.
Capacity output: 2000 sheets / day (1.22) × 2.44m slab).
Coating cost: 2-5 yuan / MI.
Basic operation process of roll coating production line
1. Put into production: put the coated material on the conveying platform and start working.
2. Dust remover, start dust removal: remove the oil and dust.
3. Primer roller coating: adjust the thickness of paint and plate according to Calver mechanical engineer.
4. Drying and leveling machine: drying through the IR area in the tunnel to prepare for the next spraying.
5. UV dryer: drying by ultraviolet light.
6. Belt conveyor: buffer.
7. Primer sander: perform surface sanding.
The above is the basic operation process of Roll coating production line . Here, we need to remind you that the production process flow of the roll coating production line will be different according to the product characteristics and the effect to be displayed.